6000 - 2000 Coil Unit

Technical Information:
Chassis mounted coil tubing unit.
Rated to 3200 meters (10,500 feet) with 1 1/4 tubing
-2300 meters with 1 1/2 tubing
-1500 meters with 1 3/4 tubing

Prime Mover:
Kenworth TA 800 Caterpillar C-15 14.0L turbocharged aftercool electronic engine 525 BHP maximum power

Compressors:
HYD 660-2000 Four stage rated to 660CFM maximum air flow at 2000 PSI (14000ka)

Injector:
HYD WD-30 coil tubing injector
30,000 lb dual rated 

Crane:
FASSI 150A-22 Articulate crane
 
Catch Tank:
10m3 (62 bbls) modular solids containment system

Special Features:
This fully integrated component designed with low fuel consumption and emission controls meeting current Federal standards.

Fully intergraded components designed for coal bed methane completions and workovers as well as oil and gas well workover and remedial production programs.
Fully automated telescoping operators station

 

Our Safety

CWC is a proud participant of the Safety Stand Down 2010 Program!

We are committed to protecting the health and safety of our employees, colleagues, the general public, and our environment.

View

Our People

At CWC our employees are the heart of the company and management is committed to making CWC a top employer in the industry.

Our compensation and benefit programs are targeted to be among the best in the industry.

View

Our Investors

CWC is a growing oilfield services company operating in many of the major oil and natural gas producing regions of Canada. Providing a wide range of wellsite solutions to oil and natural gas companies, we focus on offering technologically advanced equipment and services at competitive prices.

View

Our Mission

To be the best well servicing supplier by providing technologically advanced equipment, a safety oriented, experienced labor force, an economical solution to our clientele and value for our stakeholders.

View